混凝土搅拌车罐体容积越用越小的原因有哪些?

作者:http://www.zkzsljbc.com 时间:2020-11-18

1.随车带上减水剂
1. Bring water reducer with the vehicle
减水剂是一种在维持混凝土坍落度不变的条件下,能减少拌合用水量的混凝土外加剂,随车携带,能对混凝土进行很好的调节。不过在加入减水剂的时候,一定要记得有商砼站化验室的人在场,否则混凝土质量强度不够,驾驶员要承担后果。
Superplasticizer is a kind of concrete admixture which can reduce the mixing water under the condition of maintaining the concrete slump unchanged. It can be carried along with the vehicle and can adjust the concrete well. However, when adding water reducing agent, we must remember that there are people in the laboratory of commercial concrete station, otherwise the concrete quality strength is not enough, and the driver should bear the consequences.
2.回厂检查罐内水量
2. Return to the factory to check the water volume in the tank
每次出车任务完成回到站内的时候,检查储水罐内的水量,让水罐中的水随时处于满罐的状态,以备不时之需。
When returning to the station after completing the task, check the water volume in the water storage tank. It is better to keep the water in the water tank full at any time in case of emergency.
3.离厂前检查混凝土质量
3. Check the concrete quality before leaving the factory
可能会因为原料的不同,每一盘混凝土质量都会有变化。在装好混凝土离场时,一定要检查罐内混凝土的塌落度情况以及和易度,小心混凝土的提前凝结和混凝土分层沉淀。
Due to the different raw materials, the quality of each plate of concrete will change. When loading and leaving the site, it is necessary to check the slump and workability of the concrete in the tank, and be careful of the early setting of the concrete and the layered precipitation of the concrete.
4.减少车辆行驶时间
4. Reduce vehicle travel time
混凝土运距一般在直径30范围以内,出车之前规划好路线以及车辆通行情况,尽量减少车辆在路上的时间。
The concrete transportation distance is generally within the range of 30km in diameter. The route and vehicle traffic condition shall be planned before the vehicle is set out, so as to minimize the time of vehicles on the road.
5.减少损失先卸料
5. Reduce loss and unload first
如果遇到人为因素或者不可抗因素,导致长时间无法卸料的情况,应随时查看罐内混凝土情况,一旦发现混凝土开始凝结。在报备负责人之后立刻进行卸料,以防整个罐体报废。据了解,市面上12方的罐体,不算人工以及误工费用,在8万左右。
If human factors or irresistible factors lead to long time unable to unload, check the concrete condition in the tank at any time, once the concrete starts to set. Discharge immediately after reporting to the person in charge to prevent the whole tank from being scrapped. It is understood that the 12 square tank on the market is about 80000, regardless of labor and delay costs.